Back to overview
Maintenance

UPS test

Aug 04 at 08:43am CEST  –  Aug 04 at 09:26am CEST
Affected services
SVR.JS website
SVR.JS forum
SVR.JS git server
SVR.JS download server
SVR.JS analytics server
svrjs.link custom URL shortener

Status Report Update State Resolved
Aug 04 at 09:26am CEST

The testing of the UPS is finished. The UPS runtime (from disconnection from the electric power to low battery signal) is 35 minutes.

Status Report Update State Created
Aug 04 at 08:43am CEST

The UPS (Uninterruptible Power Supply) for our servers will be tested. NUT estimated UPS runtime to be around 40 minutes. We will test the UPS by disconnecting the UPS from the electric power.